BLD-Final | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | PASS |
Brandon Shaw
|
|
|
Justin **cleared** Phone #: ###-####
|
DOC - Permit Finaled | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PART |
Jim Storey
|
|
|
sean Phone #: ###-#### bld insp. ok for occupance/ bond app. in works
|
BLD-Conference | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Garage only // Justin Phone #: ###-####
|
BLD-Energy code compliance | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PART |
Tony Young
|
|
|
house only- Justin Phone #: ###-####,, fire block with rock wool ok,, verify at energy inspection,, ok to insulate
|
BLD-Framing/Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PART |
Tony Young
|
|
|
Justin Cafferty - Partial framing inspection Phone #: ###-####,,, soffits ok to cover
|
BLD-Conference | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, ?s on fireplace,, measure from firebox brick
|
BLD-Energy code compliance | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PART |
Tony Young
|
|
|
Partial energy on soffits - Sean ###-####,, soffits with living above insulation ok,, spray foam,, ok to cover with rated material
|
BLD-Framing/Rough-in | 5/3/2019 | 5/7/2019 | 5/7/2019 | A | PART |
Dave Hannah
|
|
|
Justin-partial on lower soffits to cover Phone #: ###-#### ok all but for lagger needs to have lags screws added
|
BLD-Wall Bracing | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Tony Young
|
|
|
shear // justin Phone #: ###-####,, mostly existing and moment frame,, per Dean Briggs engineer
|
BLD-Footing | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|