BLD-Final | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
Kate-please call Kate for access info-NO ONE can cancel this inspection but Kate (current parcel owner/general contractor) Phone #: ###-####
|
BLD-Blower Door Test Results | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | DONE |
Jim Storey
|
|
|
Kate-please call Kate for access info-NO ONE can cancel this inspection but Kate (current parcel owner/general contractor) Phone #: ###-#### 3.98
|
DOC - Permit Finaled | | | 6/5/2019 | | DONE |
|
|
|
|
BLD-Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | CANC |
Jim Storey
|
|
|
Per Arrow with Berlum Development Co, not ready for final inspection
Call for garage code Phone #: ###-#### >> Inspection requested via web by Kate Kennedy
|
BLD-Aging Inspection | 5/30/2019 | 5/30/2019 | 5/30/2019 | | NR |
Jim Storey
|
|
|
per 480 Need blower door...
|
BLD-Final | 5/24/2019 | 5/28/2019 | 5/29/2019 | P | NR |
Brandon Shaw
|
|
|
Need blower door...
|
BLD-Framing/Rough-in | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Energy code compliance | 1/15/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PART |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PART |
Jim Storey
|
|
|
James Phone #: ###-#### c/n posted// bolts for 4 ply mlb/calk for 2-2x6 header 51 inch supporting 4 ply mlb./ finsh hardware and nailling/fireblk unsuable spaces. ok to insulate.
|
BLD-Wall Bracing | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman
|
BLD-Wall Bracing | 11/21/2018 | 11/26/2018 | 11/26/2018 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman
|
BLD-Footing | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Jim Sly
|
|
|
Pouring at 2:30, requesting late morning - Rowdy Phone #: ###-####
|