BLD-Final | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.89
|
BLD-Final | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick no public works sign off to allow final insp.
|
BLD-Final | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick needs mec final first
|
BLD-Other | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 1/2/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 12/31/2018 | 12/31/2018 | 12/31/2018 | P | FAIL |
Brandon Shaw
|
|
|
Per plans- (2) 9 1/2 LVL's required at bearing wall header, Master closet... Break in double top plates, bearing wall, Master closet... Need Engineering approval for A3 truss, bottom cord broken... Truss engineering packet frozen, not able to review any pages...
|
BLD-Wall Bracing | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 10/25/2018 | 10/25/2018 | 10/25/2018 | A | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|