Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD18-03106
StatusFinaled
Name BENCHMARK CONSTRUCTION INC
Site Address 3629 S BANNER AVE
Project NameVibraPro2 Paint Booth
Customer Number 
ePlanReviewYes
Description
(VIBRAPRO2) **Permit for installation of a new paint booth and rooftop mechanical unit. Work to include: enclosing a 1,540 sq. ft. portion of a pre-fabricated metal building, installation of a new paint booth, mechanical rooftop unit, and new interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is not Fire Sprinklered. All work to be done per the approved plans and applicable codes and ordinances. **JHB*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/20/20193/20/20193/20/2019PPASS
DetailsMike Jordan
DOC - Permit Finaled3/20/20193/20/20193/20/2019PPASS
DetailsMike Jordan
BLD-Final3/18/20193/19/20193/19/2019PPEND
DetailsMike Jordan
Ask for Stacie at the front desk. Plans are on the shelf by the new foundation Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. Structural final ok. Will fianl when public works finals, mech and electrical finals.
FIRE-Final Inspection3/18/20193/18/20193/18/2019PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection3/14/20193/15/20193/15/2019AFAIL
DetailsJim Page
Waiting for verification of class 1 wiring and need suppression permit finaled.

Ask for Aaron or Mike at the front desk when you arrive. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
FIRE-Final Inspection3/13/20193/14/20193/14/2019PFAIL
DetailsTroy Cobbley
Waiting for verification of class 1 wiring and need suppression permit finaled.
FIRE-Final Inspection3/4/20193/5/20193/5/2019AFAIL
DetailsTroy Cobbley
See the city approved notes for items marked that need corrected. Items included exhaust clearance from hvac intake, 3' housekeeping clearance, signage, class 1 electrical and ventilation interlock.....ect.


Plans are on-site. Ask for Stacie at the front desk. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
BLD-Energy code compliance2/14/20192/15/20192/15/2019APASS
DetailsJim Sly
Plans are on rack by new foundation. Ask for Stacie at the front desk. We infilled the ceiling and exterior walls with insulation. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
BLD-Final2/14/20192/15/20192/15/2019ANR
DetailsJim Sly
Plans are on rack by new foundation. Ask for Stacie at the front desk. We infilled the ceiling and exterior walls with insulation. Ready for final. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger
Talked to Clayn.........Gave him the list ......For finals to be completed, prior to calling for Structural final.
BLD-Foundation1/28/20191/29/20191/29/2019APASS
DetailsMike Jordan
We have concrete scheduled for 1:00pm. We should have the rebar in place by 10:00am. We do have MTI scheduled for rebar and cylinders, if required. This inspection is for one column footing. Phone #: ###-#### Inspection requested via web by Clayn Sonderegger