Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-03233
StatusFinaled
Name LM CONSTRUCTION CO LLC
Site Address 8485 S FEDERAL WAY Unit: 110
Project NameTeffco Warehouse Ste 110
Customer Number 
ePlanReviewYes
Description
(TEFFCO WAREHOUSE - SUITE 110) Permit for the first time build-out of a warehouse space in the south half of a new warehouse building. Shell/Core was built under BLD18-00596 and site work, envelope and exterior lighting were approved with the shell permit. The 2,950 sq ft Teffco Office was permitted under BLD18-01401 and included the tenant demising wall through the center of the building and plumbing fixtures for the warehouse. Warehouse will be used for storage of Teff Flour. Equipment platform and area below platform will be used for manufacturing of grains. Work to include: equipment platform, ships ladder, separation wall, doors, grain and storage containers. This building is fire sprinklered in accordance with NFPA 13 with 60 ft yards for unlimited area. Utilizes ANSI/ASHREA 90.1. Special Inspections Required, see form 310. A separate racking permit is required if racks are installed over 8 feet in height or for high-piled combustible storage. Separate permits will be required for the building fire protection systems, as regulated by the Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/19/20197/22/20197/22/2019APASS
DetailsJim Storey
Mike Phone #: ###-####
FIRE-Final Inspection7/17/20197/19/20197/19/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Michael Phone #: ###-####
FIRE-Conference7/2/20197/2/20197/2/2019ADONE
DetailsJim Page
During my fire sprinkler inspection it was noticed that equipment was running, asked warehouse personnel if they were setting up equipment or if they were producing. I was informed that they were in fact producing. The fire sprinkler inspection has not been finaled for extra work, the electrical permit is in issued status as of this entry and no life fire safety inspection has been performed. I spoke with Gareth over the phone and informed him that production should not be happening until all inspections are complete and finaled for all permits associated with area of work.
FIRE-Conference5/16/20195/16/20195/16/2019PDONE
DetailsJim Page
Fire conference complete, GC will need to contact a fire sprinkler contractor to fix blocked sprinkler head issues, elevated platforms and possible head addition under industrial containers.

Mike- please call Phone #: ###-####
FIRE-Final Inspection5/16/20195/16/20195/16/2019PCANC
DetailsJim Page
Mike- please call Phone #: ###-####
BLD-Conference5/14/20195/14/20195/14/2019PDONE
DetailsJim Storey
Michael Phone #: ###-####