BLD-Final | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Mike Jordan
|
|
|
Cody- please call for access Phone #: ###-####
|
DOC - Permit Finaled | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Provide landing from on exterior door from master bedroom. provide blower door test rsults.
|
BLD-Energy code compliance | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mike Jordan
|
|
|
Coty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mike Jordan
|
|
|
Coty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PART |
Mike Jordan
|
|
|
Call ahead // Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Nail off all multiply trusses per the engineering, B2 E2 and A20. Roll block C2 and C3 trusses. Install hangar on A01 truss for bearing. Install all blocking for Gyp board shear walls.
|
BLD-Framing/Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | NR |
Jim Storey
|
|
|
Cody Phone #: ###-#### need air seal/ need truss engneering
|
BLD-Framing/Rough-in | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2082159239 >> Inspection requested via mobile web by Cody
|
BLD-Wall Bracing | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2082159239 >> Inspection requested via mobile web by Cody
|
BLD-Framing/Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | FAIL |
Mike Jordan
|
|
|
Call prior to going Phone #: 2082159239 >> Inspection requested via mobile web by Cody. Install all missed blocking, complete portal frames, install holdowns, re nail missed areas on sheathing.
|
BLD-Foundation | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | PART |
Mike Jordan
|
|
|
wall- Derik Phone #: ###-####
|
BLD-Footing | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PART |
Mike Jordan
|
|
|
Derik Phone #: ###-####
|