Information based on query as of Monday, August 26, 2024.
Permit Information
Permit NumberBLD18-03251
StatusFinaled
Name CM COMPANY
Site Address 1701 S RAYMOND ST
Project NameICCU Overland Storage
Customer Number 
ePlanReviewYes
Description
(IDAHO CENTRAL CREDIT UNION) **Permit is to convert an existing 19,760 sq. ft. retail store into a storage warehouse building for furniture, promotional products, and office supplies. The prior tenant was Regency Carpet Barn under permit BLD08-01632. A northern portion of the building will be demolished to reduce the total tenant area of the warehouse to 14,460 sq. ft. This building is fully Fire Sprinklered with an approved Fire Alarm system. Work to include: new asphalt parking lot, site work, new exterior finishes/roof, exterior doors, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. A reduction to the occupant load for plumbing fixture counts has been approved by the building official. An occupant load of 15 shall be posted at the front entrance. Racking that exceeds 8 ft. in height requires a separate Building Permit. Any alterations or modifications to the building’s Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/22/20194/23/20194/23/2019PPASS
DetailsMike Jordan
I have had to move zoning and landscape until tomorrow at 11:00 am if you could come after that it would be great. Thanks Phone #: ###-#### Inspection requested via web by Jimmie Miller. ok for perm occ.
BLD-Final4/19/20194/22/20194/22/2019PCANC
DetailsMike Jordan
I have final zoning landscape at 11:00 with Andrea and if it passed i need final building right after if possible, so I can get occupancy certificate and move the owners in. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jimmie Miller
BLD-Final4/16/20194/19/20194/19/2019PNR
DetailsBrandon Shaw
I have final Zoning/ landscape set up for 2:30. Please come after that has passed if it don''t pass I will cancel it. Phone #: ###-#### Inspection requested via web by Jimmie Miller
FIRE-Final Inspection4/19/20194/19/20194/19/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are placed with current inspection tags. Final life fire safety inspection complete.

Treasure Valley Fire protection and Priority electric are going to schedule fire sprinkler and alarm. Make this one the final life/safety please. Phone #: ###-#### Inspection requested via web by Jimmie Miller
FIRE-Final Inspection4/16/20194/17/20194/17/2019ACANC
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled before a life safety inspection. Phone #: ###-#### Inspection requested via web by Jimmie Miller
FIRE-Final Inspection4/11/20194/16/20194/15/2019ACANC
DetailsTroy Cobbley
I believe final plumbing, mechanical,electrical, are complete for final but can you check to make sure so i will be ready to call in final occupancy when landscape and zoning are completed. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jimmie Miller
BLD-Other2/25/20192/26/20192/26/2019PCANC
DetailsMike Jordan
Mechanical HVAC inspect condensate line for the mini split and visual on the heat tape wrapping that pipe. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Needs mech inspection.
BLD-Energy code compliance2/23/20192/25/20192/25/2019PPASS
DetailsMike Jordan
Insulation inspection on B line exterior wall. Phone #: ###-#### Inspection requested via web by Jimmie Miller. North exterior wal.
BLD-Framing/Rough-in2/25/20192/25/20192/25/2019PPASS
DetailsMike Jordan
Insulation inspection on B line exterior wall. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Interior steel stud framed walls ok.
BLD-Framing/Rough-in2/22/20192/22/20192/22/2019PNR
DetailsMike Jordan
Interior wall inspection. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Needs electrical rough in inspection first.
BLD-Framing/Rough-in2/7/20192/7/20192/7/2019PPASS
DetailsMike Jordan
Framing and shear wall inspection. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Exterior steel stud framed shear walls/holdowns and wind girts ok.
BLD-Energy code compliance1/31/20192/1/20192/1/2019APASS
DetailsMike Jordan
Roofing insulation inspection Phone #: ###-#### Inspection requested via web by Jimmie Miller
BLD-Other1/22/20191/23/20191/23/2019ADEFR
DetailsMike Jordan
Structural Steel on B line of building. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Welding, ok to frame and sheet one side only after special inspection has taken place on welds.
BLD-Concrete1/9/20191/11/20191/11/2019PPART
DetailsJim Sly
Jimmie Phone #: ###-####
Interior slab OK pending MTI special inspection, tests and approvals.
BLD-Energy code compliance1/3/20191/4/20191/4/2019APASS
DetailsMike Jordan
Ridged Polystyrene on foundation wall. Phone #: ###-#### Inspection requested via web by Jimmie Miller
BLD-Foundation12/27/201812/28/201812/28/2018APART
DetailsBrandon Shaw
North foundation for new building front. Work in progress. Ok to place cocrete pending special inspection.
BLD-Footing12/20/201812/21/201812/21/2018APART
DetailsMike Jordan
pour @ 12 // Daryl Phone #: ###-####. North footings for new building front. Work in progress. Ok to place cocrete pending special inspection.