BLD-Blower Door Test Results | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | DONE |
Tell Riley
|
|
|
4.06 ACH 50 1166 CFM @ 50 PA
|
BLD-Final | 9/13/2019 | 9/13/2019 | 9/16/2019 | P | PASS |
Tell Riley
|
|
|
Damion Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | FAIL |
Tell Riley
|
|
|
call for access // Damion Phone #: ###-####//second story layout does not reflect plans//added room upstairs// add step at garage man door//need blower door test//no crawl space access// see correction notice//
|
BLD-Framing/Rough-in | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
Jim Sly
|
|
|
Damion Phone #: ###-#### Frame and Energy pass.
|
BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PART |
Jim Storey
|
|
|
Damon Phone #: ###-#### colm plm drilled thur 5 ply nee approval/ other isued marked on truss engineering// ok to insulate.
|
BLD-Wall Bracing | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Jim Sly
|
|
|
wall // Damion Phone #: ###-####
|
BLD-Footing | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Jim Sly
|
|
|
Damion Phone #: ###-####
|