BLD-Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
PAT Phone #: ###-####//all trades finals complete//all signatures required complete//final complete//
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####
|
BLD-Aging Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | | CANC |
Tell Riley
|
|
|
entire project almost complete//
|
BLD-Aging Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | | PASS |
Tell Riley
|
|
|
still working on projects
|
BLD-Final | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Tell Riley
|
|
|
Bill Phone #: ###-####//ok per approved plans//
|
FIRE-Final Inspection | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Bill Phone #: ###-####
|
FIRE-Final Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | FAIL |
Jim Page
|
|
|
Self closing door hinges on east level 1 units are not operable, doors will not close on their own. Provide signage for fire sprinkler riser room and FACP for fire alarm control panel. Provide apartment unit number for each apartment, signage not in place at time of inspection. Install knox box for fire department. Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | NR |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Mike Jordan
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | FAIL |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Still needs mech and fire sprinkler rough in inspections. Noted several aeas were fire caulking is missing. All concealed ares at the 1hr. florr cieling assembly need to be shhet rocked.
|
BLD-Wall Bracing | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Jim Sly
|
|
|
shear // bill Phone #: ###-####
|
BLD-Foundation | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|