BLD-Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
PAT Phone #: 208-941-829//trades finals complete//all signatures complete//final complete//
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####
|
BLD-Aging Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | | PASS |
Tell Riley
|
|
|
working on finishing all permits
|
BLD-Aging Inspection | 8/5/2019 | 8/5/2019 | 8/5/2019 | | PASS |
Tell Riley
|
|
|
|
BLD-Final | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-#### temp occ. ok pending trades.
|
FIRE-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Life safety/Egress plan provided and letter of intent to be scaned to case file. This life safety plan to be provided by the Apartment Leasing Office to each tenant at move in. Bill Phone #: ###-####
|
FIRE-Final Inspection | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need project related fire alarm permit finaled, both fire sprinkler permits finaled, need clarification/add the emergency lighting and additional smoke alarms as per the approved plans and fire dept access implemented as discussed.
Bill Phone #: ###-####
|
BLD-Other | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jim Sly
|
|
|
RCChannnel inspection- Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/12/2019 | 3/12/2019 | 3/13/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | NR |
Jim Sly
|
|
|
bill Phone #: ###-####
|
BLD-Framing/Rough-in | 3/8/2019 | 3/8/2019 | 3/9/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 3/7/2019 | 3/6/2019 | 3/7/2019 | A | DONE |
Bob Archibald
|
|
|
Review of rated floor/ceiling penetrations.
|
BLD-Framing/Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | NR |
Jim Sly
|
|
|
Bill Phone #: ###-#### Need Mech rough in approval.......
|
BLD-Conference | 3/1/2019 | 3/4/2019 | 3/5/2019 | A | CANC |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 1/9/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Jim Sly
|
|
|
wall // dane Phone #: ###-####
|
BLD-Footing | 1/8/2019 | 1/9/2019 | 1/10/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|