BLD-Final | 5/23/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Sly
|
|
|
Heather- please call for access Phone #: ###-####
|
DOC - Permit Finaled | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 2/1/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Jim Sly
|
|
|
Michael Phone #: ###-####
|
BLD-Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | CANC |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | DONE |
Brandon Shaw
|
|
|
As per discussion with electrician, insulator, and home owner- Fire caulk all openings in electrical service box, and foam/air seal around said box. Electrician and insulator to take pictures and submit to home owner....
|
BLD-Final | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | CANC |
Brandon Shaw
|
|
|
Michael Phone #: ###-####
|
BLD-Wall Bracing | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Sly
|
|
|
Mikael Phone #: ###-####
|
BLD-Footing | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Jim Sly
|
|
|
Val Phone #: ###-#### Footing for Patio cover........OK.
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | NR |
Jim Sly
|
|
|
Troy Phone #: ###-#### Need all trade approvals.
|
BLD-Footing | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Jim Sly
|
|
|
Troy Phone #: ###-####
|