BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Brandon Shaw
|
|
|
Lockbox on the hose bib. Code is 1987 Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
DOC - Permit Finaled | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/30/2020 | 7/30/2020 | 7/30/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.2
|
BLD-Final | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | FAIL |
Brandon Shaw
|
|
|
Address to be readily visable... Post Blower door test... Glazing at stiar landing to be tempered...
|
BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/27/2019 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | | PASS |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | DEFR |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Framing/Rough-in | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Jim Storey
|
|
|
* see Joist calculations for penetrations located with the plans on the drywall mud located in kitchen area. Please call after inspection. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Framing/Rough-in | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PART |
Jim Storey
|
|
|
Call if any questions or concerns. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand plm drilled top chord of I joist two locatins need engineer fix from manufacture/ fire blk drop ceilling at walls// need mech insp. // air seal not done.
|
BLD-Aging Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|