Permit Number | BLD18-03665 |
Status | Finaled |
Name |
HHS CONSTRUCTION LLC
|
Site Address |
5946 E BARBER DR
|
Project Name | Harris North Lot 100 Block 1 |
Customer Number | |
ePlanReview | Yes |
Description |
CAT I HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 4030 sq. ft., two story (first story 2735 sq. ft., second story 1295 sq. ft.) single family dwelling with 6 bedrooms, 4.5 bathrooms, approximately 693 sq. ft. of covered patio/porch and a 933 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code proposed. ***BJM***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|