BLD-Final | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Tell Riley
|
|
|
Bob Phone #: ###-####//plan mod for steps at service door and railing complete//final is complete//no signature card to sign//
|
BLD-Final | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | NR |
Tell Riley
|
|
|
Bob Phone #: ###-####//need to modify hand rail to meet plan mod//discussed onsite//
|
BLD-Final | 8/12/2019 | 8/12/2019 | 8/13/2019 | P | PEND |
Tell Riley
|
|
|
joe Phone #: ###-####//discussed ramp at exit door--too steep--plans show 1:12//
|
BLD-Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Tell Riley
|
|
|
Joe Phone #: ###-####//building complete per plans//temp occupancy ok//final occupancy once parking lot is finished and signage is installed//
|
FIRE-Final Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
Joe Phone #: ###-####
|
BLD-Final | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | NR |
Tell Riley
|
|
|
Joe Phone #: ###-####//need electrical final//need fire final//new sidewalks and ADA ramp to be poured 7/19/19//
|
FIRE-Final Inspection | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PART |
Troy Cobbley
|
|
|
Hvac unit won't go into heat mode for duct detector testing. Owner agreed to lock out the unit until it is repaired and shut down could be tested. All other life safety items appear ok. Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Tell Riley
|
|
|
Joe Phone #: ###-####//truss framing and beams installed per plans for modification//engineering was reveiwed//two electrical wires were fire caulked at the penetrations//
|
BLD-Ceiling Grid Inspection | 7/1/2019 | 7/1/2019 | 7/2/2019 | P | PASS |
Dave Hannah
|
|
|
Joe- modification reveiw has nothing to do with this inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### stop work/ submitals to get aproved by planreview not done/ need ul listings for wall assemley trusses bearing in wall . prevously noted with c/n an not responded to.
|
BLD-Ceiling Grid Inspection | 6/25/2019 | 6/25/2019 | 6/26/2019 | P | NR |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### blocking in wall at trusses ok to cover with sheet rock
|
BLD-Energy code compliance | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Ceiling insulation...
|
BLD-Other | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Joe- drywall nai off inspection Phone #: ###-####
|
BLD-Wall cover | 6/10/2019 | 6/10/2019 | 6/11/2019 | P | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### picl up butt seams 8 oc/ plm pipe repairs to gyp and fire stop / and truss removal or fire rating pending. ok to cover int walls
|
BLD-Wall cover | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### defered to pm
|
BLD-Wall cover | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Jim Storey
|
|
|
vapor barrier exterior // Joe Phone #: ###-####/ pending architect submittal for wall protection
|
BLD-Energy code compliance | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Jim Storey
|
|
|
Joe- Phone #: ###-#### wall insulation ok/ need vappor barrior/ pending p/l fire wall aplacation at trusses.
|
BLD-Other | 5/16/2019 | 5/17/2019 | 5/20/2019 | A | PART |
Dave Hannah
|
|
|
fire wall // Joe Phone #: ###-#### sheet rock behind ledger ok
|
BLD-Wall Bracing | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### over driven renail
|
BLD-Framing/Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### c/n 602 1 hr from bothsides provide engineering to resolve to planreview.
|
BLD-Other | 4/2/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Dave Hannah
|
|
|
pre slab // Joe Phone #: ###-####
|
BLD-Footing | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Dave Hannah
|
|
|
pour time 3pm-Joe Phone #: ###-####
|