BLD-Final | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mike Jordan
|
|
|
Sean Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mike Jordan
|
|
|
All issues were resolved.
|
BLD-Final | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Provide blower door test result and post. 20 min. door to be self closing. Firecaulk penetrations in garage.
|
BLD-Energy code compliance | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-#### FRAME AND ENERGY.........Pass.
|
BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | NR |
Mike Jordan
|
|
|
Call 20 minutes ahead // Shawn Phone #: ###-####. Will need to nail on tall walls. Ok to insulate.
|
BLD-Framing/Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PART |
Jim Sly
|
|
|
Sean Phone #: ###-#### Most of corrections completed.....some deficiencies per tall wall Engineering.....missed hd's Staple spacing alternate hd,s Meet with inspector for conference.
|
BLD-Framing/Rough-in | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Complete lateral bracing on A03, A04,A05, A08 and A011 trusses. NAil BX1 and G2 trusses per the enginering. Roll block E4 trusses. Trusses in hangars on D4 truss not seated. All portal frames shall be nailed. Install all missed blocking and nail, install LIB. Provide the engineering for the tall walls in garage. Correction notice posted.
|
BLD-Footing | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PART |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|