BLD-Final | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-####
|
BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PEND |
Tony Young
|
|
|
Chase Phone #: ###-####// wanted Dave only
|
BLD-Final | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PART |
Tony Young
|
|
|
Chase Phone #: ###-####,, temp occ. ok, ok to move in, needs to make handrails and guardrails meet min. compliance, add as needed on existing, door signage, restroom dispensaries
|
FIRE-Final Inspection | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications (fire sprinklers are basement only), fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Exit signage/emergency lighting to be added in gym and exit path on level 2 (exterior exit, corridor has exit sign), added exit signs/emergency lighting to be verified during BLD final inspection. Per conversation with Ron Johnson, fire alarm system is controlled by main school fire panel, knox box for school will be utilized for this building, no other knox box required. Final life fire safety inspection for area of work complete.
will be verified on bChase Phone #: ###-####
|
BLD-Conference | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | DONE |
Tell Riley
|
|
|
Chase Phone #: ###-####//working on door hardware//new ramp complete//discussed existing doors to remain at first floor bathrooms(no changes indicated on plans)-opening widths narrow//
|
BLD-Framing/Rough-in | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-####
|
BLD-Framing/Rough-in | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-#### second floor strapes ok
|
BLD-Conference | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|