BLD-Final | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Mike Jordan
|
|
|
energy cert notice posted on breaker box door.
handrails have been raised Phone #: ###-#### Inspection requested via web by Stephen Griswold. All issues were resolved.
|
BLD-Blower Door Test Results | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | DONE |
Mike Jordan
|
|
|
4.3
|
BLD-Final | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Stephen Griswold. Exterior handrail to main entry mounted to low. provide blower door test results and report as well as the required energy cert and post. Correction notice posted.
|
BLD-Aging Inspection | 1/21/2020 | 1/21/2020 | 1/22/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | NR |
Tony Young
|
|
|
Please call with an estimated ETA for inspection, I''d like to be there. Phone #: ###-#### Inspection requested via web by Stephen Griswold// needs hillside,, trades,, hand rails per code,, blower door test,, fire caulking,, address, etc
|
BLD-Framing/Rough-in | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Jim Storey
|
|
|
Please call 30 minutes before arrival. We would like to meet with inspector on site. Phone #: ###-#### Inspection requested via web by Stephen Griswold
|
BLD-Energy code compliance | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Jim Storey
|
|
|
Please call 30 minutes before arrival. We would like to meet with inspector on site. Phone #: ###-#### Inspection requested via web by Stephen Griswold
|
BLD-Framing/Rough-in | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephen Griswold,, see painted corrections,, seal plates, need truss engineering, strap plates, etc,, ok to insulate
|
BLD-Foundation | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew Clark
|
BLD-Footing | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Tony Young
|
|
|
Andrew- wall footing Phone #: ###-####,, footings already done,, foundation wall ok
|
BLD-Footing | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Conference | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PART |
Tony Young
|
|
|
Andrew Phone #: ###-####,, foundation ?s,, needs to be 24" frost protection,, can use existing retaining wall footing to support the first couple of floor joists with proper sill and attachment
|
BLD-Footing | 4/30/2019 | 5/2/2019 | 5/2/2019 | P | CANC |
Tony Young
|
|
|
Jared Phone #: ###-#### cancel per jared
|