BLD-Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Garage code s 1905 help yourself Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 4/12/2019 | 4/12/2019 | 4/12/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 2.87
|
BLD-Framing/Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Dave Hannah
|
|
|
Thanks Inspection requested via web by bryan murdoch
|
BLD-Energy code compliance | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Dave Hannah
|
|
|
Thanks Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch. Install all missing straps on portal frames. Install additional 2x6 studs under C01 3 ply at bearing point. Install the SDS screws on the 3ply C01 truss as shown on the truss engineering. Ok to insulate.
|
BLD-Wall Bracing | 12/19/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Brandon Shaw
|
|
|
First floor only... Vertical straps at port hole framing to be installed befotre framing rough-in...
|
BLD-Foundation | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Dave Hannah
|
|
|
Eric Williams Phone #: ###-####
|
BLD-Footing | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|