BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
DOC - Permit Finaled | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | DONE |
Tony Young
|
|
|
4.05
|
BLD-Final | 6/27/2019 | 7/1/2019 | 7/1/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin.. Mech. final has failed.
|
BLD-Energy code compliance | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Jim Sly
|
|
|
Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | FAIL |
Tony Young
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Scott Asin// c/n posted,, needs 6 sided coverage on all walls,,, fix gap above the front door
|
BLD-Framing/Rough-in | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Storey
|
|
|
The Framer ask if you could call him before hand. He would like to be there to solve any problems. Stevie Alters ###-####
Thank you Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Wall Bracing | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, exterior ok
|
BLD-Foundation | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PART |
Tony Young
|
|
|
Manny-would late AM if possible Phone #: ###-####
|
BLD-Footing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PASS |
Tony Young
|
|
|
trying to pour around 1pm // Victor Phone #: ###-####
|