BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Mike Jordan
|
|
|
Please call in advance. No Superintendent on premises and gate requires code for access. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
FIRE-Final Inspection | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please call in advance. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
FIRE-Final Inspection | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | FAIL |
Troy Cobbley
|
|
|
Corrections for life safety have been made. Life safety can be given a temp when a permit has been issued for the racking in Building E as discussed. Or a final when the racking permit for Building E is finaled.
Corrections have been made. Please contact me before heading to the site. Superintendent will be coming and going throughout the day. I want to make sure we have a representative to walk with you. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
FIRE-Final Inspection | 3/26/2020 | 3/30/2020 | 3/30/2020 | P | FAIL |
Troy Cobbley
|
|
|
Provided additional emergency lighting as discussed. Need the racking permit addressed in Building E as discussed. Other life safety items appear ok.
Phone #: ###-#### Inspection requested via web by Ian Franklin
|
BLD-Conference | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Wall cover | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Mike Jordan
|
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Energy code compliance | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Mike Jordan
|
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Mike Jordan
|
|
|
drywall inspection for firewall on stairs and elevators building two Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Other | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar and 6x6 mesh building two second floor and screw inspection on the deck second floor Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Concrete | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | CANC |
Mike Jordan
|
|
|
second floor rebar and 6x6 mesh inspection and decking screw inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Other | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PART |
Dave Hannah
|
|
|
Insulation inspection Phone #: ###-#### Inspection requested via web by Glen Farrell ground floor east west and south walls ok
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Mike Jordan
|
|
|
Southend of building two Phone #: ###-#### Inspection requested via web by Glen Farrell. SW4 type shearwalls ok for insulation,
|
BLD-Other | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar inspection at loading docks building two Phone #: ###-#### Inspection requested via web by Glen Farrell. Reinforcement for slab on grade.
|
BLD-Other | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Mike Jordan
|
|
|
rebar inspection building two southend Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Other | 7/26/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar inspection middle section building one and BLD18 -04286 middle section building two Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/23/2019 | 7/24/2019 | 7/24/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Glen Farrell//interior footings on large building//rebar ok pendinngs special inspections///
|
BLD-Footing | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Mike Jordan
|
|
|
Rebar inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD-Footing | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PART |
Mike Jordan
|
|
|
Glen- Building 2 rebar footing inspection Phone #: ###-####. North footing. Work in progress on installing dowels. Ok to place concrete pending special inspection.
|
BLD-Foundation | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PART |
Mike Jordan
|
|
|
rebar.. pour at 11 // Glenn Phone #: ###-####. East, West and south perimeter footings. Special inspector to verify installation of #4 dowels at 4ft. oc for cold joint. Also noted elevator pit slabs have been placed. Contractor noted that it was inspected by All West (special inspections agency).
|