BLD-Final | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Tell Riley
|
|
|
Mike Phone #: ###-####//plan mod footing ok//
|
BLD-Framing/Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Tell Riley
|
|
|
back patio addition//trades rough ok//framing ok//ok to insulate only//
|
BLD-Conference | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | DONE |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
BLD-Other | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | NR |
Tell Riley
|
|
|
ok to cover // Mike Phone #: ###-####//get letter from design engineer on framing and shear changes//also include bearing changes for beam in kitchen.//electrical/mechanical will need to be rough in and inspected prior to framing.///
|
BLD-Framing/Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PART |
Tell Riley
|
|
|
Partial framing // Mike Cook Phone #: ###-####//ok ot cover bath area,kitchen area//do not cover beams//add hanger to beam to beam conection//partial only//call for other framing inspections on addition and beams//add footings for beam in kitchen//
|
BLD-Foundation | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Tell Riley
|
|
|
Greg- foundation wall inspection Phone #: ###-####//foundation ok per plans//
|
BLD-Footing | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Tell Riley
|
|
|
geo-tech approved per Melissa//footing width and depth ok per approved plans// rebar installed per engineering//set backs ok per plans.//
|
BLD-Foundation | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | CANC |
Tell Riley
|
|
|
Greg- Phone #: ###-####/
|