Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-04392
StatusFinaled
Name TRESIDIO HOMES
Site Address 1653 S KIMBALL WAY
Project NameCLOVERFIELD ESTATES SUB 3-1
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION - Adding spread footings to foundation, changing window header in bedroom 3 JJN 1/18/19** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2779 sq. ft., two story (first story 2274 sq. ft., second story 505 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 299 sq. ft. of covered patio/porch and a 820 sq. ft. attached garage per the approved plans and any notations. R-1CDA zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/13/20196/14/20196/14/2019PPASS
DetailsMike Jordan
Call for access // gari Phone #: ###-####
DOC - Permit Finaled6/14/20196/14/20196/14/2019PPASS
DetailsMike Jordan
All issues have been resolved.
BLD-Final6/11/20196/12/20196/12/2019PFAIL
DetailsMike Jordan
Gari-please call for access code Phone #: ###-####. Provide tempered glazing at window next to shower/tub. 20 min. door to be self closing.
BLD-Blower Door Test Results6/12/20196/12/20196/12/2019PDONE
DetailsMike Jordan
3.0
BLD-Energy code compliance3/27/20193/28/20193/28/2019PPASS
DetailsMike Jordan
Gari Phone #: ###-####
BLD-Framing/Rough-in3/27/20193/28/20193/28/2019PPASS
DetailsMike Jordan
Gari Phone #: ###-####
BLD-Framing/Rough-in3/25/20193/26/20193/26/2019PFAIL
DetailsMike Jordan
Gari Phone #: ###-####. Provide fireblocking at fireplace fur out at ceiling level, fur down and fur out 2x4 wall at main entry hallway and at ceiling level upsatirs at dryer vent. Install missing strapson tall wall per the engineering. provide tempered glazing in window next to shower/tub. strap double top plate breaks upstairs, north wall. Studs shall also be continous, north wall upstairs. provide additional 2x6 blocking underneath truss bearing, east wall upstairs. Install purlins on T9 trusses (two next to T10 truss) were the roof sheathing has been omitted. provide additional info on T6 trusses upstairs? Correction notice posted. ok to insulate.
BLD-Wall Bracing3/7/20193/8/20193/8/2019APASS
DetailsMike Jordan
Juan Phone #: ###-####
BLD-Foundation2/8/20192/8/20192/8/2019PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing2/5/20192/6/20192/6/2019APART
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron . Noted footing subgrade and form work does not meet the min. 35 degrees to place concrete. Contactor will need supplemental heat to place concrete.
BLD-Footing2/4/20192/5/20192/5/2019PCANC
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron . Cancelled by concrete subcontracotr via phone call.