BLD-Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Gari- please call for access. Phone #: ###-####
|
DOC - Permit Finaled | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/23/2019 | 5/23/2019 | 5/23/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.56
|
BLD-Energy code compliance | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | FAIL |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Install the missed holddown on the south side of the dinning room portal frame. Install missed lateral bracing on truses T2, T3, T4 and t17. Nail off the T21 2 ply per the engineering. Provide additional 2x6 stud under the T18 truss at bearing. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Ok to install tyvek.
|
BLD-Framing/Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | FAIL |
Mike Jordan
|
|
|
Kai Phone #: ###-####. Remove tyvek for wall bracing inspection. Previous nspections have failed due to not all sheathing being installed, staples used in portal frame areas and several areas not attached.
|
BLD-Wall Bracing | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | FAIL |
Mike Jordan
|
|
|
Dari Phone #: ###-####. CNail off portal frames, Install remaining sheathing and nail off all missed areas.
|
BLD-Wall Bracing | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | NR |
Mike Jordan
|
|
|
Gaudy Phone #: ###-####
|
BLD-Foundation | 1/28/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru. New plans submitted, passed and brought to job site. All corrections made.
|
BLD-Foundation | 1/25/2019 | 1/28/2019 | 1/28/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru. Approved plans do match what concrete contractor has built. Due to framing changes, piont loads have been moved. Noted to contracotr that he will need to submit a plan mod so that approved plans match what is being built in the field. Also noted to contracotr that moving foward, approved plans need to reflect the actual construction.
|