FIRE-Final Inspection | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. CO2 detector installed and glycol system installed at 35 gallon max.
Mike Phone #: ###-####
|
BLD-Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | P | PART |
Jim Sly
|
|
|
Mike Phone #: ###-#### OK for Temp. Occ. OK for Perm. Occ. when Fire and Mech. signs off........Perm.
|
FIRE-Final Inspection | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
mike Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete. Glycol system and CO2 have not been installed yet, CO2 will require a detection aoarm due to amount being used. TCO for life fire safety is complete, a follow up inspection will be required after permenant CO2 system and glycol system is installed.
Duplicate inspection request, this request is cancelled.
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/27/2019 | 2/27/2019 | 2/28/2019 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
FIRE-Conference | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | DONE |
Troy Cobbley
|
|
|
Met with Mike discussed requirements needed for final. Mike mentioned not having glycol system installed in time for final so we gave him Ron Johnson's phone and email to discuss possible TCO when they are ready.
Mike Phone #: ###-####
|