BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | NR |
Tony Young
|
|
|
Josh Phone #: ###-####,, needs ele. final
|
BLD-Other | 3/1/2019 | 3/4/2019 | 3/5/2019 | P | PASS |
Jim Sly
|
|
|
sofit // Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PART |
Tony Young
|
|
|
Joshua Phone #: ###-####,, interior ok after fixes
|
BLD-Foundation | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PART |
Tony Young
|
|
|
Josh-rebar Phone #: ###-####,, new foundation pieces ok
|
BLD-Framing/Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, needs sill bolts per plan/code,, tool shed?.. soffit protection.. needs engineer fix on front portal frame,, ( concrete and frame not matched up),, ok to insulate but leave open areas for re-inspection
|
BLD-Wall Bracing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PART |
Brandon Shaw
|
|
|
RV garage only, tool shed to finished by framing rough-in...
|
BLD-Wall Bracing | 1/31/2019 | 2/4/2019 | 2/4/2019 | A | NR |
Tony Young
|
|
|
Joshua Phone #: ###-####
|
BLD-Foundation | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PEND |
Brandon Shaw
|
|
|
Need Geo subgrade and PW arroval... Rebar OK...
|
BLD-Foundation | 1/17/2019 | 1/22/2019 | 1/22/2019 | A | PART |
Jim Storey
|
|
|
Jeremy-would like as early am as possible Phone #: ###-#### pic w contractor if needed
|