FIRE-Final Inspection | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jay Phone #: ###-####
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-#### final perm ok pending all signoffs. // 12/10/19 TCH Everything signed off
|
FIRE-Final Inspection | 12/3/2019 | 12/4/2019 | 12/4/2019 | P | NR |
Jim Page
|
|
|
AES did not pass inspection on 3DEC2019, inspection will not be completed until AES communicator is finaled, disposition will be labeled as not ready.
Jay Phone #: ###-####
|
FIRE-Final Inspection | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | FAIL |
Jim Page
|
|
|
Repair exit discharge emergency lighting on west and northwest exits. Provide signage for fire alarm control panel room. AES communicator permit needs to be finaled before life fire safety inspection will be completed (FIR18-00152)
Jay Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-#### fire treated wood ok to cover// roof insulation ok
|
BLD-Framing/Rough-in | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Jim Storey
|
|
|
Jay-please call 30 minutes prior to meet for access Phone #: ###-#### need 34.2 verifacation of roof insulatio// fire treted backing required per plan.
|