BLD-Final | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Brandon Shaw
|
|
|
Greg-please call prior for access Phone #: ###-####
|
DOC - Permit Finaled | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.6
|
BLD-Final | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | FAIL |
Mike Jordan
|
|
|
Greg-call for access Phone #: ###-####. Provide the blower door test results and post. Complete grading. Need to provide min. 2% slope from foundation. Correction notice posted.
|
BLD-Energy code compliance | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Mike Jordan
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Wall Bracing | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Greg Phone #: ###-####
|
BLD-Wall Bracing | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | NR |
Mike Jordan
|
|
|
Louis Phone #: ###-####
|
BLD-Wall Bracing | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Mike Jordan
|
|
|
possible first thing in the amLuis Phone #: ###-####. portal frame construction only at front of house. Tyvek install ok. Will needs another inspection when the T11 structural siding has been installed. will alos need the ICC ESR report on site as well.
|
BLD-Foundation | 2/4/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constr
|
BLD-Foundation | 1/30/2019 | 1/31/2019 | 1/31/2019 | P | PEND |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron lira. Need 7 day break results prior to concrete placement.
|
BLD-Conference | 1/30/2019 | 1/31/2019 | 1/30/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron lira Inspection cancelled via mobile web on Wednesday, January 30, 2019.
|
BLD-Foundation | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate construction. Onsite. stemwall not yet constructed. Footing concrete was placed yesterday. Noted no concrete blankets on site and conc. footings were not covered. Called Ricardo with aggerate construction and requested core samples from footing for strenght test. Noted stemwall will not be allowed to be placed until 7 day strength test results are given.
|
BLD-Footing | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|