BLD-Final | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Tell Riley
|
|
|
Emanuel Phone #: ###-####//final complete per plans//transition added at bathroom door//
|
FIRE-Final Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Emanuel Phone #: ###-####
|
BLD-Final | 10/10/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Tell Riley
|
|
|
Emmanual Phone #: ###-####//temp ok to move equipment in//no card onsite//need verification of accessible restroom from architect-dimensions on plans do not reflect actual//transition is too tall at restroom door//call for final when resolved//
|
FIRE-Final Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the exit discharge light has been installed at the main exit as discussed. Emanuel Phone #: ###-####
|
FIRE-Final Inspection | 10/10/2019 | 10/14/2019 | 10/14/2019 | A | FAIL |
Troy Cobbley
|
|
|
I called contact twice and then went to project site and found no one and the business is locked. No inspection performed. Emmanual Phone #: ###-####
|
BLD-Final | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | CANC |
Tell Riley
|
|
|
Emanuel Phone #: ###-####//will reschedule for monday//
|
FIRE-Final Inspection | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | CANC |
Troy Cobbley
|
|
|
Wasx supposed to be scheduled for monday per contact
Emanuel Phone #: ###-####
|
BLD-Conference | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | DONE |
Tell Riley
|
|
|
Emaunal Phone #: ###-####//submit plan change for distance from west wall on paint booth//wall is CMU//
|
FIRE-Conference | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | DONE |
Troy Cobbley
|
|
|
We spoke about getting building inspector approval for rated walls since they can not meet the min. 3'-0" clearance rule and we spoke about class 1 wiring near openings.
Emanual Phone #: ###-####
|