BLD-Final | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hartman
|
FIRE-Final Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for scope of work complete.
Joel Phone #: ###-####
|
BLD-Energy code compliance | 6/10/2019 | 6/10/2019 | 6/11/2019 | P | PASS |
Dave Hannah
|
|
|
insulation in roof trusses ok
|
BLD-Other | 6/10/2019 | 6/10/2019 | 6/10/2019 | A | PASS |
Dave Hannah
|
|
|
Going to start drywall on ceiling today, wasn''t sure if you need to look at the insulation before we cover. Phone #: ###-#### Inspection requested via web by Joel Hartman ok to cover after other trades ok rough ins
|
BLD-Other | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hartman roof framing ok but need engineer sign off on epx bolts
|