BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PART |
Tell Riley
|
|
|
Tell we fire caulked as requested and added the glass and can show you that it is fire rated so if you would please give me a 20 minute head start i will be in Meridian tomorrow. thank you Phone #: ###-#### Inspection requested via web by Russell Valline//corrections made//final is complete pending fire final approval//temp occupancy approved until fire finals//
|
BLD-Final | 9/4/2019 | 9/5/2019 | 9/6/2019 | A | FAIL |
Tell Riley
|
|
|
Tell came out but only gave partial due to fire final not complete this was completed september 4 2019 Phone #: ###-#### Inspection requested via web by Russell Valline//need to fire caulk penetrations in rated rooms and corridor//need to add glass in doors to complete rated corridor//
|
FIRE-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is ok per boise fire until the upgrade agreement for the fire alarm system has been finalized. Phone #: ###-#### Inspection requested via web by Russell Valline
|
BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Russell Valline//emergency discharge light is now working//need doors on rooms//
|
FIRE-Final Inspection | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Mark Scharfen
|
|
|
Emergency discharge light not working. All e-lights inside functioned correctly. Extinguisher hung. No doors are hung. Will verify discharge either at fire alarm test or when building final is rescheduled.
Phone #: ###-#### Inspection requested via web by Russell Valline
|
BLD-Ceiling Grid Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Tell Riley
|
|
|
Please give me a call if you cant make it by 3:00 Phone #: ###-#### Inspection requested via web by Russell Valline//trades passed for grid cover//grid ok per plans//
|
BLD-Other | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | DONE |
Tell Riley
|
|
|
Please give me a call if you cant make it by 3:00 Phone #: ###-#### Inspection requested via web by Russell Valline
|
BLD-Ceiling Grid Inspection | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | NR |
Tell Riley
|
|
|
Thomas Phone #: ###-####//need fire rough in inspection and electrical rough for cover of ceiling grid//
|
BLD-Framing/Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Tell Riley
|
|
|
Tell we have all the other inspector coming also to sign off on hv/ac and plumbing rough in. Maybe give me a call before your arrival. Phone #: ###-#### Inspection requested via web by Russell Valline//rough ins all passed//ok to cover framing//
|
BLD-Framing/Rough-in | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Russell Valline//framing ok per plans//ok to one side at plumbing walls//add nail plates wher needed//call for grid inspection//no insulation--interior walls//
|
BLD-Framing/Rough-in | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Russell Valline//wanted to start rated corridors//no cover until mech/plumbing/electrical roughs//advised to call Daryl to discuss//
|
BLD-Ceiling Grid Inspection | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PART |
Jim Sly
|
|
|
come late in the am if you could have fire roughin in the am. Thanks Phone #: ###-#### Inspection requested via web by Russell Valline Areas West side of Gym......OK.
|