BLD-Final | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Tell Riley
|
|
|
Rescheduled with mechanical finalized. Phone #: ###-#### Inspection requested via web by James McGuire///HVAC final complete//final complete per plans// CC issued//
|
DOC - Permit Finaled | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Tell Riley
|
|
|
Rescheduled with mechanical finalized. Phone #: ###-#### Inspection requested via web by James McGuire
|
BLD-Conference | 6/24/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Tell Riley
|
|
|
Rescheduled with mechanical finalized. Phone #: ###-#### Inspection requested via web by James McGuire
|
BLD-Final | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | NR |
Tell Riley
|
|
|
Mike Phone #: ###-####//needs HVAC final inspection//
|
BLD-Framing/Rough-in | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Brandon Shaw
|
|
|
Insulation...
|
BLD-Framing/Rough-in | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Jim Sly
|
|
|
James Phone #: ###-####
|
BLD-Wall cover | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Jim Sly
|
|
|
Shane Phone #: ###-#### Shear.....OK.
|
BLD-Conference | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Jim Sly
|
|
|
Foundation stem wall. Phone #: ###-#### Inspection requested via web by James McGuire
|
BLD-Footing | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Jim Sly
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PART |
Brandon Shaw
|
|
|
James-partial-interior only
|