BLD-Final | 7/24/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 7/24/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 4.7
|
BLD-Energy code compliance | 5/17/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/16/2019 | 5/20/2019 | 5/20/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall ok to insulate but c/n on site
|
BLD-Wall Bracing | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Brandon Shaw
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Brandon Shaw
|
|
|
No change in location, footing and foundation are ok to pour, with no new Geo soil subgrade, per phone call with Melissa Jannusch
|
BLD-Footing | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PEND |
Dave Hannah
|
|
|
Ryan Phone #: ###-#### ok after new geo tech is aproved
|
BLD-Footing | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | FAIL |
Dave Hannah
|
|
|
Ryan Phone #: ###-#### needs a new geo tec on soil
|
BLD-Foundation | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Conference | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Brandon Shaw
|
|
|
Footing... Work in progress...
|