BLD-Aging Inspection | 7/15/2020 | 7/15/2020 | 7/17/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 7/14/2020 | 7/14/2020 | 7/15/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Jim Storey
|
|
|
Kent- please call for access 30 before Phone #: ###-#### walls ok to cover c/n made ok.
|
BLD-Framing/Rough-in | 2/3/2020 | 2/4/2020 | 2/4/2020 | P | FAIL |
Tell Riley
|
|
|
call ahead // Ken Phone #: ###-####//need fire sprinkler roug in completed//add backing for Accessibility//secure demising wall studs//provide wall assembly for 1 hr room at fire riser//
|
BLD-Framing/Rough-in | 12/26/2019 | 12/26/2019 | 12/26/2019 | P | NR |
Tell Riley
|
|
|
metal stem wall // Kent Phone #: ###-####// Ken had questions on demising wall--plans show to underside of roof sheathing--wall stops at roof insulation--refered him to architect//some walls have been one sided--asked him to leave uncovered until all trades passed and framing is approved//
|
BLD-Framing/Rough-in | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Tell Riley
|
|
|
Call ahead 30 minutes - truss bracing // Kent Phone #: ###-####//engineering and engineers letter from site visit and approval onsite dated Nov 20, 2019 stamped and signed reviewed onsite//trusses ok per engineer//
|
BLD-Wall Bracing | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | CANC |
Tell Riley
|
|
|
call for keycode access // Kim Phone #: ###-####//CN still onsite--corrections have not been completed//updated engineering will be needed to reflect what has been completed onsite--see correction notice//no wall bracing inspection needed at this time//
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | FAIL |
Tell Riley
|
|
|
Call for access //
ken Phone #: ###-#### //CN posted--truss fixes to dont reflect engineering--see CN//
|