BLD-Final | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
James Phone #: ###-####
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.83
|
BLD-Final | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need PW grading approval...
|
BLD-Final | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | NR |
Brandon Shaw
|
|
|
Pre final walk thru...
|
BLD-Energy code compliance | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PEND |
Brandon Shaw
|
|
|
4 additional lights being added to stairs, need ELE rough-in cover approval. Per Engineering- DF #1 to be used for bearing end of cut trusses...
|
BLD-Framing/Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PEND |
Brandon Shaw
|
|
|
Provide Engineering approval/ revised fix for floor trusses, F6, F7, F19. Bearing end has been cut and/or modified...
|
BLD-Framing/Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brandon Shaw
|
|
|
James Phone #: ###-####
|
DOC - Permit Finaled | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | CANC |
Brandon Shaw
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Jim Storey
|
|
|
Call ahead // James Phone #: ###-#### ok to remove tub fur out walls.
|
BLD-Wall Bracing | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
BLD-Wall Bracing | 6/11/2019 | 6/11/2019 | 6/12/2019 | P | NR |
Dave Hannah
|
|
|
James Phone #: ###-#### no plans on site
|
BLD-Foundation | 4/24/2019 | 4/24/2019 | 4/25/2019 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Dave Hannah
|
|
|
Alvalo Phone #: ###-####
|