Permit Information
Permit NumberBLD19-00514
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5992 E BARBER DR
Project NameHarris North #1
Customer Number 
ePlanReviewYes
Description
***Prescriptive component energy approach***WUI Zone A requirements*** Permit for the construction of a new 3807 sq. ft., two story (first story 2512 sq. ft., second story 1295 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 587 sq. ft. of covered patio/porch and a 730 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH SPRINKLERS ARE REQUIRED. LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/201910/28/201910/28/2019APASS
DetailsDave Hannah
Les Phone #: ###-####
DOC - Permit Finaled10/28/201910/28/201910/28/2019PPASS
DetailsDave Hannah
BLD-Energy code compliance7/1/20197/2/20197/2/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in6/25/20196/26/20196/26/2019APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in6/21/20196/21/20196/21/2019PFAIL
DetailsJim Storey
Wes Phone #: ###-#### c/n posted/joist to girder hangers not nailled no support/ mlb hangers not nailed/ s1.1 vertical supports not per plan// bg1 truss missing 1/4 sds screws.
BLD-Other6/10/20196/11/20196/11/2019ACANC
DetailsBrandon Shaw
sofits-les Phone #: ###-####
BLD-Other6/10/20196/10/20196/10/2019PPASS
DetailsBrandon Shaw
Soffit- OK to cover...
BLD-Wall Bracing5/21/20195/21/20195/21/2019PPASS
DetailsBrandon Shaw
Less Phone #: ###-####
BLD-Foundation4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing4/23/20194/23/20194/23/2019APASS
DetailsBrandon Shaw
Work in progress...