BLD-Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph knight
|
FIRE-Final Inspection | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
|
BLD-Framing/Rough-in | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Jim Storey
|
|
|
Have revised set og plans showing no changes to the bathroom. Building closes at 3pm Phone #: ###-#### Inspection requested via web by Joseph knight final ok pending fire.
|
FIRE-Final Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | CANC |
Jim Page
|
|
|
Inspection request will be rescheduled to coincide with fire sprinkler inspection. This request is cancelled per conversation with point of contact.
Joe Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Framing/Rough-in | 4/28/2019 | 4/29/2019 | 4/29/2019 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph knight Inspection of Curb on roof for HVAC.....OK to cover.
|