BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | NH |
Tony Young
|
|
|
Zack Phone #: ###-####,, will need address facing 18th also,, locked,, no answer
|
BLD-Other | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Tony Young
|
|
|
Zack- post for deck inspection Phone #: ###-####,, post footings ok
|
BLD-Energy code compliance | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-#### c/n mlbeams installed per revised engineering ok
|
BLD-Framing/Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Dave Hannah
|
|
|
Zack Phone #: ###-#### ok to insulate need enginer to ok header over window c/n on site
|
BLD-Other | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Dave Hannah
|
|
|
Zack-air seal Phone #: ###-####
|
BLD-Wall Bracing | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, ok after redoing some areas
|
BLD-Footing | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
Tony Young
|
|
|
Jerry Phone #: ###-####,, 2 new point load footings,, ok
|