Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00676
StatusFinaled
Name EISENMAN PETER L
Site Address 3300 N MOUNTAIN VIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
HILLSIDE- MODIFICATION - ENTRY VESTIBULE SHORTER & NOT ENCLOSED 11/25/19 **jab** Permit to build a 1,200sq' attached garage and 70sq' enclosed entry vestibule (not living space). All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/27/201912/30/201912/30/2019APASS
DetailsTell Riley
Call for access Pete Phone #: ###-####//corrections made and final complete//
DOC - Permit Finaled12/30/201912/30/201912/30/2019PPASS
DetailsTell Riley
BLD-Final12/26/201912/27/201912/27/2019ANR
DetailsTell Riley
Call 1 hour ahead- Peter Phone #: ###-####/need to add smoke CO detectors per code//garage and vestibule complete//
BLD-Framing/Rough-in11/25/201911/25/201911/25/2019PPART
DetailsTell Riley
Peter Phone #: ###-####//front entry--had Pete go down for plan mod for changes on entry//shorter and tied into existing with ridge and rafter--IRC compliant//plan mod to reflect actual//garage already complete//
BLD-Energy code compliance10/16/201910/16/201910/16/2019PPASS
DetailsTell Riley
Randy Phone #: ###-####//garage framing and energy ok//will need inspection for new front entry of home//
BLD-Framing/Rough-in10/14/201910/15/201910/15/2019APASS
DetailsTell Riley
Peter Phone #: ###-####//ok to insulate//
BLD-Wall Bracing10/8/201910/9/201910/9/2019APASS
DetailsTell Riley
eisemn Phone #: ###-####//corrections made//shear ok per plans//
BLD-Wall Bracing10/7/201910/7/201910/7/2019PFAIL
DetailsTell Riley
Add hold down where missed on NW corner//have engineer provide staple conversion in place of specified nails for shear walls//add nails to all holes in STHD 14 hold downs//
BLD-Framing/Rough-in10/4/201910/7/201910/7/2019PCANC
DetailsTell Riley
Peter Phone #: ###-####
BLD-Foundation8/27/20198/29/20198/29/2019APASS
DetailsTell Riley
Peter Phone #: ###-####//ok per plans//
BLD-Footing8/21/20198/22/20198/22/2019APASS
DetailsTell Riley
Peter Phone #: ###-####//footings and setbacks per plans//