BLD-Final | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Tell Riley
|
|
|
Call for access Pete Phone #: ###-####//corrections made and final complete//
|
DOC - Permit Finaled | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 | A | NR |
Tell Riley
|
|
|
Call 1 hour ahead- Peter Phone #: ###-####/need to add smoke CO detectors per code//garage and vestibule complete//
|
BLD-Framing/Rough-in | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PART |
Tell Riley
|
|
|
Peter Phone #: ###-####//front entry--had Pete go down for plan mod for changes on entry//shorter and tied into existing with ridge and rafter--IRC compliant//plan mod to reflect actual//garage already complete//
|
BLD-Energy code compliance | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
Randy Phone #: ###-####//garage framing and energy ok//will need inspection for new front entry of home//
|
BLD-Framing/Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Tell Riley
|
|
|
Peter Phone #: ###-####//ok to insulate//
|
BLD-Wall Bracing | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Tell Riley
|
|
|
eisemn Phone #: ###-####//corrections made//shear ok per plans//
|
BLD-Wall Bracing | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | FAIL |
Tell Riley
|
|
|
Add hold down where missed on NW corner//have engineer provide staple conversion in place of specified nails for shear walls//add nails to all holes in STHD 14 hold downs//
|
BLD-Framing/Rough-in | 10/4/2019 | 10/7/2019 | 10/7/2019 | P | CANC |
Tell Riley
|
|
|
Peter Phone #: ###-####
|
BLD-Foundation | 8/27/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Tell Riley
|
|
|
Peter Phone #: ###-####//ok per plans//
|
BLD-Footing | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Tell Riley
|
|
|
Peter Phone #: ###-####//footings and setbacks per plans//
|