Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD19-00723
StatusFinaled
Name FORTE CONSTRUCTION SERVICES LLC
Site Address 3510 E VIA ESTANCIA LN
Project NameReifschneider Residence
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION - updating drainage and redesigning front retaining wall - now double retaining wall. JJN 12-2-19** **HILLSIDE** **WUI VALLEY PERIMETER ZONE A REQUIREMENTS** **PASSES USING UA TRADE OFF** **310 SPECIAL INSPECTIONS** Permit for the construction of a new 3,320 sq. ft., two story (first story 2,945 sq. ft., below grade 375 sq. ft.) single family dwelling with 2 bedrooms, 2.5 bathrooms, approximately 53 sq. ft. of covered patio/porch and a 637 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.
NO SPRINKLERS REQUIRED. LGM.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20204/30/20204/30/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Ken Johnson
DOC - Permit Finaled4/30/20204/30/20204/30/2020PPASS
DetailsBrandon Shaw
BLD-Conference4/17/20204/17/20204/17/2020PPASS
DetailsBrandon Shaw
Consult for final before Hillside is completre Phone #: ###-#### Inspection requested via web by Ken Johnson
DOC - Permit Finaled4/17/20204/17/20204/17/2020PPASS
DetailsBrandon Shaw
BLD-Foundation3/5/20203/5/20203/5/2020PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing2/24/20202/24/20202/24/2020PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation12/18/201912/19/201912/19/2019APASS
DetailsBrandon Shaw
wall // Wes Phone #: ###-####
BLD-Footing12/3/201912/3/201912/3/2019PPASS
DetailsBrandon Shaw
Wes Phone #: ###-####
BLD-Energy code compliance11/26/201911/26/201911/26/2019PPASS
DetailsBrandon Shaw
Ken - fire block inspection Phone #: ###-####
BLD-Energy code compliance11/22/201911/25/201911/25/2019PPASS
DetailsBrandon Shaw
Exterior walls only...
OK to cover exterior walls, cover one side of interior wall...
BLD-Framing/Rough-in11/20/201911/21/201911/21/2019APASS
DetailsBrandon Shaw
Ken Phone #: ###-####
BLD-Framing/Rough-in10/1/201910/2/201910/2/2019PPASS
DetailsBrandon Shaw
Wall bracing- Pending special Inspection, all of brace panel- OK
BLD-Concrete9/4/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Inspection of reinforcing mesh in main part of house Phone #: ###-#### Inspection requested via web by Ken Johnson
BLD-Concrete9/4/20199/4/20199/4/2019PCANC
DetailsBrandon Shaw
Inspection of reinforcing mesh in main part of house >> Inspection requested via web by Ken Johnson Inspection cancelled from web by: Ken Johnson
BLD-Footing8/26/20198/27/20198/27/2019APASS
DetailsBrandon Shaw
Interior footing inspection Phone #: ###-#### Inspection requested via web by Ken Johnson
BLD-Foundation6/26/20196/26/20196/26/2019PPASS
DetailsBrandon Shaw
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing6/12/20196/13/20196/13/2019APASS
DetailsBrandon Shaw
Work in progress...