BLD-Final | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | FAIL |
Mike Jordan
|
|
|
Call aheadKevin - requesting virtual inspection Phone #: ###-####. provide egress ladder in window well. Lower handrail on stairs to basement. Inspection conducted via google duo.
|
BLD-Energy code compliance | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Mike Jordan
|
|
|
not ready until 10 am // Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Mike Jordan
|
|
|
Jose Phone #: ###-####. All issues resolved except for tempered glazing, windows on order. ok to insulate.
|
BLD-Framing/Rough-in | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | FAIL |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Complete airseal. Complete fireblocking. repair all broken floor joist, justify holes drilled into beams. Tempered glazing required at window by tub upstairs, and by french doors. strap all cut double top plates.
|
BLD-Framing/Rough-in | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | NR |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Needs to complete airseal first.
|
BLD-Wall Bracing | 9/25/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Mike Jordan
|
|
|
Jose Phone #: ###-####
|
BLD-Conference | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | DONE |
Mike Jordan
|
|
|
Kevin Phone #: ###-####
|
BLD-Foundation | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | PART |
Mike Jordan
|
|
|
Jerimy Phone #: ###-####
|
BLD-Foundation | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | CANC |
Mike Jordan
|
|
|
rebar // Cody Phone #: ###-####
|
BLD-Footing | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PART |
Mike Jordan
|
|
|
rebar // Cody Phone #: ###-####. Basement footings .
|