BLD-Energy code compliance | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Tell Riley
|
|
|
early am // David Phone #: ###-####//fix cut joist under shower pan//
|
BLD-Framing/Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Tell Riley
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2019 | 7/29/2019 | 7/29/2019 | P | NR |
Tell Riley
|
|
|
David Phone #: ###-####//need plumbing,mechanical and electrical rough inspections//
|
BLD-Framing/Rough-in | 7/12/2019 | 7/22/2019 | 7/22/2019 | A | CANC |
Tell Riley
|
|
|
THIS WAS CANCEL THE MORNING OF Jim Phone #: ###-####
|
BLD-Wall Bracing | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//shear corrections made//ok to continue//
|
BLD-Wall Bracing | 7/16/2019 | 7/18/2019 | 7/18/2019 | P | NR |
Tell Riley
|
|
|
Dave Phone #: ###-####//add sblocking at braced locations as on plans//
|
BLD-Foundation | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//setbacks ok// wall rebar installed// vents installed//
|
BLD-Footing | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Tell Riley
|
|
|
Jim Phone #: ###-####//surveyed point installed. setbacks meet requirements per plans//
|
BLD-Footing | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tell Riley
|
|
|
as early as possible // Jim Phone #: ###-####//setbacks, getting surveyed point installed prior to wall inspection.// rebar installed in footings// work in progress.//
|
BLD-Footing | 6/11/2019 | 6/12/2019 | 6/12/2019 | P | NR |
Tell Riley
|
|
|
Jim Phone #: ###-####//need to establish property line to measure correct setbacks for additon.//call for re-inspection.//
|