Permit Information
Permit NumberBLD19-00870
StatusIssued
Name RR BUILDING SPECIALTIES LLC
Site Address 2393 W AIRPORT WAY
Project NameWildland Firefighter TI
Customer Number 
ePlanReviewYes
Description
(WILDLAND FIREFIGHTER FOUNDATION) **This building shall be fully fire sprinklered under this permit. ** Demo permit: BLD18-00618 - Permit for an addition and renovation of an existing rental car facility and change of use to an exhibition hall and office. Work to include construction of exterior site work, new exterior finishes, new monument tower building addition, new stairway to mezzanine, new interior nonbearing partition walls, new doors and millwork, plumbing, electrical, and mechanical work and interior finishes in compliance with Ch. 8 of the 2015 IBC. All work to be done per the approved plans and applicable codes and ordinances. SPECIAL INSPECTIONS are required per form #310 for structural steel welding, masonry, wood, and soils noted on sheet S0.01. This building will be fully Fire Sprinklered and will require a separate permit for the design and installation of the automatic fire sprinkler system. The fire sprinklers shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance6/12/20206/15/20206/15/2020PPASS
DetailsJim Storey
screened // Gabe Phone #: ###-####
BLD-Conference6/9/20206/10/20206/10/2020APASS
DetailsJim Storey
Gabe Phone #: ###-#### insulation ok
BLD-Framing/Rough-in6/5/20206/8/20206/8/2020APASS
DetailsJim Storey
GABE Phone #: ###-####
BLD-Conference5/4/20205/6/20205/6/2020APASS
DetailsJim Storey
Screened- inspection for 12:30 Gabe Phone #: ###-#### exterior sheer nail ok// stair review ok// plate plan to be submitted to joe to delete wall protection west side.
BLD-Aging Inspection4/22/20204/22/20204/22/2020 PASS
DetailsJim Storey
wip
BLD-Foundation12/9/201912/10/201912/10/2019APASS
DetailsJim Storey
call for gate code // Gabe Phone #: ###-####
BLD-Foundation12/2/201912/2/201912/2/2019PPASS
DetailsJim Storey
Gabe Phone #: ###-#### si compaction report pending