BLD-Final | 11/12/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/12/2019 | 11/14/2019 | 11/14/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.3
|
BLD-Energy code compliance | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 9/3/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Other | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Dave Hannah
|
|
|
soffits sheetrock
|
BLD-Wall Bracing | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PART |
Dave Hannah
|
|
|
Eber Phone #: ###-#### ex ok but needs to add two hold downs by window front bed room
|
BLD-Foundation | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Dave Hannah
|
|
|
Many- would like to pour around 2 oclock Phone #: ###-####
|
BLD-Footing | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Dave Hannah
|
|
|
pouring at 11 // Manny Phone #: ###-####
|