Permit Information
Permit NumberBLD19-01000
StatusFinaled
Name DAGLE HOMES INC
Site Address 3670 W QUAIL HOLLOW CT
Project NameMichael & Kathy Crowley Reside
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION 6/5/19 changing elevation of house JJN** **HILLSIDE** **WUI FOOTHILLS ZONE A REQUIREMENTS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2572 sq. ft., two story (first story 1722 sq. ft., second story 850 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 130 sq. ft. of covered patio/porch and a 889 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. JJN SPRINKLERS REQUIRED AND PROVIDED UNDER PERMIT FIR19-00254. LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/201911/4/201911/4/2019APASS
DetailsTony Young
Mark Dagle Phone #: ###-####
DOC - Permit Finaled11/4/201911/4/201911/4/2019PPASS
DetailsTony Young
BLD-Blower Door Test Results11/4/201911/4/201911/4/2019PDONE
DetailsTony Young
Mark Dagle Phone #: ###-####/// 4.32
BLD-Final10/24/201910/24/201910/24/2019PFAIL
DetailsTell Riley
Mark Phone #: ###-####//correction notice issued//need to add combo smoke detector//guard too low at upper deck//adjust garage man door hinges//need blower door test//seal separation wall penetrations//
BLD-Other8/16/20198/16/20198/16/2019PPART
DetailsTony Young
soffit is stucco,, work in progress
BLD-Wall Bracing8/15/20198/16/20198/16/2019APASS
DetailsTony Young
Mark Phone #: ###-####,, interior shear
BLD-Energy code compliance8/14/20198/15/20198/15/2019PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Framing/Rough-in8/14/20198/15/20198/15/2019PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Framing/Rough-in8/9/20198/9/20198/9/2019PPART
DetailsTony Young
Mark Phone #: ###-####-please call 30 minutes prior to meet for access,, met framer, builder on site,, c/n posted,, needs fix on sprinkler in the front entry area,, needs freeze protection,, shear wall fixes, straps on shear, header as needed, brace trusses as needed,, nail braces as needed,, ok to insulate
BLD-Framing/Rough-in8/8/20198/9/20198/9/2019ANR
DetailsTony Young
Mark Phone #: ###-####-please call 30 minutes prior to meet for access,, needs plans, truss layout
BLD-Wall Bracing7/29/20198/1/20198/1/2019APART
DetailsTony Young
James- please call for access Phone #: ###-####,, exterior ok to cover
BLD-Wall Bracing7/26/20197/29/20197/29/2019ANR
DetailsTony Young
James- please call for access Phone #: ###-####,, needs more nailing
BLD-Foundation6/5/20196/5/20196/5/2019PPART
DetailsTony Young
Mark-STEM-Phone #: ###-####,, work in progress,, ok
BLD-Footing5/31/20196/3/20196/3/2019APASS
DetailsTony Young
Derik Phone #: ###-####