BLD-Framing/Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | CANC |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Final | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Tell Riley
|
|
|
Please call Bradden (###-####) 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Bradden Jensen//final complete per plans.//
|
FIRE-Final Inspection | 6/11/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Please Call Bradden when in route. Phone #: ###-#### Inspection requested via web by Bradden Jensen
|
FIRE-Final Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide sprinkler modifications due to pendant head overspacing due to new wall. Provide annual inspection tag on the fire extinguisher.
Please call Bradden when on the way. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
BLD-Wall cover | 5/8/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Please call Bradden Jensen in advance when inspector is heading to jobsite. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
BLD-Framing/Rough-in | 5/8/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Please call Bradden Jensen in advance when inspector is heading to jobsite. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
BLD-Conference | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | DONE |
Jim Sly
|
|
|
as early as possible // Lyle Phone #: ###-####
|