BLD-Final | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Mike Jordan
|
|
|
LANCE Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. If intermediate door is installed single action hardware is to be provided.
LANCE Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | PART |
Tell Riley
|
|
|
Lance Phone #: ###-####//remove old lights above grid//add cover to junction box//grid ties ok//
|
FIRE-Final Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lights at both exits as per the approved plans, repair the emergency light over the sink, provide single action hardware at the interior south facing exit door, provide mounted and tagged fire extinguisher as discussed.
Lance Phone #: ###-####
|
BLD-Other | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Mike Jordan
|
|
|
Nathan (GC)-smoke barriers in ceiling Phone #: ###-####. Draft stop ok.
|
BLD-Framing/Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Mike Jordan
|
|
|
All fra ming issues regarding rated wall have been resolved.
|
BLD-Conference | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | CANC |
Mike Jordan
|
|
|
Call for lockbox combo // Lance Phone #: ###-####
|
BLD-Conference | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PART |
Mike Jordan
|
|
|
Lance Phone #: ###-####. Interior steel stud framed walls only ok, pending electrical rough in inspection. All patch backs in 2hr. fire wall shall be attched to framing members. provide membrane penetration protection in 2hr. fire wall. Correction notice posted.
|