Permit Information
Permit NumberBLD19-01303
StatusIssued
Name CONNER CONSTRUCTION LLC
Site Address 1014 N HOUSTON RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for a CAT II hillside backyard remodel to include: 464 sq.ft. pool cabana; approx. 236 sq. ft. seating area with fire pit; new CMU wall, Planters and Retaining walls; all new patio pavers. All work per plans, engineering and current codes. ***RDP***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/5/20208/5/20208/6/2020 PEND
DetailsTell Riley
no final inspections requested//
BLD-Aging Inspection8/4/20208/4/20208/5/2020 PEND
DetailsTell Riley
BLD-Framing/Rough-in3/23/20203/23/20203/23/2020PPASS
DetailsTell Riley
Framing Inspection.
Please contact us 20 minutes prior to have someone on site.
Thank you! Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk//email from engineer recieved//corrections made//
BLD-Framing/Rough-in3/9/20203/10/20203/10/2020AFAIL
DetailsTell Riley
Correction List:
Nailed all green plate with hand dipped galvanized nails.
Removed 3 small panels of shear to make visible the hold downs
Added Simpson S27 straps on the portal header.
A roof plan and engineering is in the fireplace. Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk//correction notice posted/need two hold downs per portal frame- only 1 per side on side portal frames//straps are not the same as specified on plans, and all 4 wall need them per the engineering// trusses ok//fix framing per plans or have enginneer approve//
BLD-Framing/Rough-in3/6/20203/9/20203/9/2020AFAIL
DetailsTell Riley
Shear wall and Framing inspection
Approved plans are on site in the fire place. Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk//CN posted//need hot dip galvanized nails in pt//need access to columns to verify attachments per plans//straps need added opposite side of sheating on all portal frame per details on plans//need truss plans//
BLD-Foundation11/18/201911/18/201911/18/2019APASS
DetailsTell Riley
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro//WIP...pending specials if required on this portion//
BLD-Foundation11/15/201911/15/201911/15/2019PCANC
DetailsTell Riley
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro//cancel per Alvaro//
BLD-Footing11/14/201911/14/201911/14/2019PPART
DetailsTell Riley
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro//cabana and planter footings--ok per plans//pending specials if required//setbacks surveyed in and per plans//
BLD-Foundation10/24/201910/24/201910/25/2019PDEFR
DetailsTell Riley
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro//defer to special inspection//spoke with contact and rebar, formwork and concrete testing will be performed//
BLD-Footing10/17/201910/17/201910/17/2019PPASS
DetailsTell Riley
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro//footings per plans//setbacks were set by surveyor//ok pending specials //
BLD-Footing10/16/201910/16/201910/16/2019PFAIL
DetailsTell Riley
*please as late as possible after 3:30pm** Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro///need geotech report approved by public works prior to pouring footings//special inspections for rebar and concrete placement are required per plans//