BLD-Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.58
|
BLD-Final | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | NR |
Tell Riley
|
|
|
Call ahead for access // Willie Phone #: ###-####//need to add window opeing device upstairs-fix the two installed as well//finish hand rail//add pipe bollard//
|
BLD-Energy code compliance | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Tell Riley
|
|
|
will Phone #: ###-####//ok//
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Tell Riley
|
|
|
Willy Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Tell Riley
|
|
|
Willy Phone #: ###-####//ok to insulate only//correction for minor framing corrections posted//
|
BLD-Wall Bracing | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Tell Riley
|
|
|
shear // will Phone #: ###-####
|
BLD-Foundation | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//install STHD 14's per plans.// will move to correct location as discussed onsite.//
|
BLD-Foundation | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PART |
Tell Riley
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//rebar installed per plans//work in progress//
|
BLD-Footing | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//setbacks ok per site plan//rebar installed per plans. //
|