BLD-Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Dave Hannah
|
|
|
Please contact JP before coming inspection. Phone #: ###-#### Inspection requested via web by Scott Hawker
|
BLD-Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | P | PART |
Mike Jordan
|
|
|
Please call JP in advance. ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero. Ok for temp. occ. Needs to installremainder of glazing, provide ADA compliant hardware on pocket door.
|
FIRE-Final Inspection | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please call JP in advance. ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero
|
FIRE-Final Inspection | 11/4/2019 | 11/5/2019 | 11/5/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide the small documents and provide the missing exit sign as discussed.
Phone #: ###-#### Inspection requested via web by Scott Hawker
|
BLD-Ceiling Grid Inspection | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Mike Jordan
|
|
|
Please call for access to building. Lock box out at back door code is 4995 Phone #: ###-#### Inspection requested via web by Scott Hawker
|
BLD-Ceiling Grid Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | NR |
Mike Jordan
|
|
|
Please call JP in advance so he can make sure the building is open for you. ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Mattie Botero. Nedds fire sprinkler rough in first.
|
BLD-Energy code compliance | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Mike Jordan
|
|
|
Please call JP at ###-####. Prefer 10am-11am. Phone #: ###-#### Inspection requested via web by Mattie Botero
|
BLD-Framing/Rough-in | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Mike Jordan
|
|
|
Please call JP at ###-####. Phone #: ###-#### Inspection requested via web by Mattie Botero
|