BLD-Final | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####// ok after fixing fire wall with fire caulking
|
DOC - Permit Finaled | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | DONE |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####/// 5.87
|
BLD-Blower Door Test Results | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | NR |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####
|
BLD-Final | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | NR |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####
|
BLD-Final | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | NR |
Tony Young
|
|
|
Screened- Tim Phone #: ###-####// needs blower door test results, fire caulking,, firewall issue ok
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PART |
Tell Riley
|
|
|
Tim Phone #: ###-####//fire place inspection complete//fire blocking installed for fireplace//insulation ok//still need to verify 1 hr rated wall at property line before final occupancy//correction notice still posted until complete//
|
BLD-Framing/Rough-in | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PEND |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, c/n posted,, Fire place?,, seal off attic from f/p,, firewall verification,, ok to insulate
|
BLD-Framing/Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | FAIL |
Tell Riley
|
|
|
//correction notice posted//
|
BLD-Wall cover | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | CANC |
Tell Riley
|
|
|
Tim Phone #: ###-####//needs framing inspection//
|
BLD-Wall Bracing | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PART |
Tony Young
|
|
|
shear// Camden Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Tim- pouring at 11 am Please as early as possible Phone #: ###-####
|